The No.36 64K BC had the Main Engine Lifted and Installed in Yangzhou Branch

7 April 2016

Yangzhou Newbuilding Branch, March 28:

The No.36 64K bulk carrier had the integrated lifting and installation of the main engine completed in slipway of Yangzhou Newbuilding Branch.

Chengxi Shipyard Co., Ltd. press release


Image by Chengxi Shipyard Co., Ltd.