|
A small shipyard of 37,000 square meters with a 280-metre quay, COSCO (Shanghai) managed to arrange proper construction space for the modules and establ ished an appropr iate offshore engineering standard QHSE management system, which was recognised by ABS. Thanks to the unremitting efforts of 1,400 staff throughout the past year, the design, structure, machinery installation, piping installation, electric installation, painting, external outfitting, commissioning, lifting lashing and fixation work were completed. All the work passed the strict inspections and tests of the end user, Petrobras, the Ecovix supervisors and the ABS inspectors. Furthermore, the ergonomic design, noise control arrangements, lifting and lashing plans have undergone assessment or field verification by worldauthoritative professional bodies. The Petrobras and Ecovix representatives spoke highly of the project management, design, construction, HSE, quality control and services of COSCO (Shanghai) Shipyard which led to a quality product and timely delivery. At the delivery ceremony, the Petrobras FPSO construction supervision manager, Mr. Bellas, said in his speech: ¡°Until now, I have in mind, one year and a half before, when I arrived here, walking in the workshops, beside Mr. Xie, when I said, this shipyard is too small, then, one worker near us said in English: we are small but we are strong. Today, I can say, he was right in his words. At this moment, with the sail way, the end of this job, that means a success, that along those months, since when we start the first cutting, on April 23, 2012." COSCO Shipyard Group Co. Ltd. press release
|