|
When an owner is striving for high production and a safe installation, demands have to be set for the systems that control the installation. So far, the automation industry has mainly focused on connectivity - ensuring the physical integration of the various control systems. The main challenge for ISDS is how to engineer the various system elements into a single system that meets all the necessary requirements in terms of safety, functionality and reliability. It is not enough simply to select and connect system elements that may individually satisfy the requirements. The challenge extends to the integration of the system elements and an understanding of each operation within the system. System elements affect each other in order to deliver the emerging properties of the complete system. The new ISDS notation is a voluntary class notation. If this notation is granted to the system, DNV will provide status reports while the software is being developed giving the status of the software’s readiness with respect to integration and completeness. Since the ISDS notation looks at the complete lifecycle, it will provide requirements for how to prepare the systems for upgrades and future configurations. The class notation will therefore also prepare for and support configuration management in the operational phase. DNV |