|
This offshore wind turbine prototype is designed to withstand the strong wind of 62.5 m/s, and to be protected from corrosion caused by the sea water. “We not only plan to supply the three same size offshore wind turbines to the South-Western 2.5GW Offshore Wind Farm Project in Jeolla province, South Korea, but also to accelerate marketing campaign overseas including Asia and Europe on the basis of ample experiences and knowhow we have accumulated from a variety of offshore plant projects,” said an HHI official. Hyundai Heavy has installed accumulated 100 MW of wind turbines in Korea and around the world to date.
Hyundai Heavy’s 5.5 MW Offshore Wind Power Turbine Installed on Jeju Island. Image by Hyundai Heavy Industries. Hyundai Heavy Industries, press release |