|
17.04.2015 Today, 16 April 2015, Vyborg Shipyard JSC (member of United Shipbuilding Corporation) and Aker Arctic Technology Inc. have signed a License and Concept Design Agreement for new icebreakers. As a reminder, two multifunctional diesel-electric- powered icebreakers 22 MW will be built at Vyborg Shipyard by order of LLC Gazprom Neft Novy Port. In the nearest time Aker Arctic engineers will start development of concept design package and perform model tests in open water and in ice conditions. At a later stage on the basis of the concept design there will be developed technical design for the vessels.
16-wheel Rubber Tired Gantry (RTG) cranes. Image by Konecranes Vyborg Shipyard, press release |